From a connected design to a signed engineering decision
Editable harnesses, sourced hardware libraries, technical reviews, controlled changes, and a history you can act on.
In this issue32 topics
Coverage: November 6 at 8:56 a.m. EST through November 13 at 9:02 a.m. EST.
A design becomes useful when people can connect the hardware, inspect what changed, and make a decision against the same revision. This week brings that work closer together: cable-level engineering on the System map, richer hardware selection, and explicit records for reviews, signatures, and change authority.
Inside DDNA#
Give Configuration Management its own home#
Configuration Management has a dedicated project area for controlled product information. The shared Parts area brings the part register and numbering controls into that navigation.
Genuine product screenshot of the empty Parts register. It shows navigation and controls, with no customer records. Populated engineering workflows are not depicted.
Choose manufacturers, alternates, and the right BOM comparison#
Part definitions now carry approved manufacturers, with one preferred manufacturer where appropriate, and bidirectional alternate-part relationships. A substitute on a BOM line remains a separate, assembly-specific decision.
Add parts from the workspace library, export the BOM to CSV, XLSX, or PDF, and compare the working configuration with a saved release. The comparison distinguishes additions, removals, moves, and changed content. This extends the shared BOM introduced previously with sourcing choices and reviewable release differences.
Take proposed changes through a signed decision#
Engineering change proposals bring covered records, impact assessments, and generated notices together. Class I proposals support board recommendations and a chair's decision; Class II proposals support an individual authorized approver. Signatures record their meaning and require reauthentication.
After the first release, a subsequent configuration release requires approved coverage of the changed records at the content being released. People can continue working before that decision. Notices of revision and specification change come from the actual differences and freeze with the submitted proposal.
Deviations and waivers identify the exact release and bounded effectivity, such as units, lots, or dates. BOM views distinguish active and expired effectivity. These records support engineering control; they do not themselves establish regulatory acceptance. Connected tools can draft and manage permitted records, while signing remains an in-app human action.
The genuine change-proposal form shows classification, effectivity, and impact fields. This is an unsaved form with no customer change records.
Close technical reviews against the revision under review#
Plan SRR, SFR, PDR, CDR, TRR, SVR, PRR, or a named review with criteria, participants, and requests for action. Closing records a signed outcome. A passing review needs met or explicitly waived exit criteria; a pass with actions must identify how those actions carry forward.
A passing SFR, PDR, or CDR can establish the corresponding functional, allocated, or product baseline for the same configuration and exact revision. A review cannot establish multiple releases. Reviews can also connect to a project task gate; untyped releases remain available.
The product's starting PDR checklist connects allocated requirements, interfaces, budgets, and baseline readiness. These are default criteria, not a customer's review.
Read history, restore design content, or branch from a point#
History presents the project's design changes on one timeline, with forks shown as branches and releases as prominent points. Inspect historical model differences, then use an authorized restore or copy action with an explicit reason.
Restoring writes new revisions for supported model, Intent, and register content; it preserves the earlier history. This is not a rollback of every project record: tasks, issues, team activity, and historical source-file bytes are outside that restore scope. DFMEA can be compared in history without being restored in place.
Engineer the harness directly on the map#
The editable Harness view brings systems, parts, named connectors, routed cables, and editing onto one canvas. Create and move records, change their parent, and retain useful positions from the earlier layout. Tidy spacing, folding, detail panels, and view choices make larger assemblies easier to inspect.
Create a connector under the selected part, choose a named connector family or an explicit custom definition, and keep reference designators distinct across the diagram. When a Blueprint relationship becomes a cable, its applicable engineering values, requirements, and history stay connected. The cable list can be exported to CSV.
Cable checks compare mating connectors, current and voltage ratings, data-link families, and stated RF frequency ranges. They also identify a connector used by multiple cables and duplicate cable designators. The findings panel supports filtering for review. Missing data stays an open engineering question rather than becoming an invented rating.
Connector editors offer the next free diagram designator and let engineers review or explicitly override a duplicate label. Externally managed systems retain their own connector labels. A converted Blueprint relationship keeps any values the selected connectors cannot carry on the separate part-to-part relationship.
The live System map shows the internal DDNA RF Demo: two synthetic parts, SMA connectors, and cable W1. The connection status checks the stated records; it is not a qualification result.
Model the product boundary and pass-through wiring#
Mark a connector for outside use and expose it on the product boundary. Represent a pass-through between connectors on the same part without inventing a separate cable or BOM item.
Boundary connector tiles support starting or ending a cable, while the stored connection remains tied to the actual connector. Outside connectors are listed with what they carry and where a pass-through reaches. Checks can identify an outside-use connector cabled inside the product or a pass-through whose outgoing cable does not carry the stated flow. Externally managed systems can also carry connectors. The map distinguishes the project itself from the components it contains and keeps cable labels clear of neighboring parts.
Select connectors, cables, and sourced board variants#
The connector library adds 218 families across board-level, power, data, industrial, vehicle, RF, and fluid connections. An off-the-shelf cable library offers 109 generic constructions across data/video, fiber, RF coax, power, industrial, and military cable assemblies. Types that fit both end connectors appear first; search and Show all expose the rest. Selecting a type fills its construction, end connectors, and stated ratings. Family geometry alone does not establish a product's electrical or environmental rating.
The board library expands across Gateworks and eight additional manufacturers, with source-linked characteristics and typed connectors. Search orderable manufacturer part numbers and select variants whose memory, temperature range, or connector population differ. Filter the browser by manufacturer, board type, accepted supply voltage, and interfaces such as Ethernet, USB-C, CAN, GNSS, and module slots. End-of-life entries are available on request. Placement uses the selected variant's ports. Unknown properties remain unknown; a library choice is not qualification evidence.
Browse the product's hardware catalog by manufacturer, board type, voltage, and interfaces. Only public catalog content is shown.
Inspect an orderable board variant and its manufacturer references before placement. This selection was not added to a project.
Specify the RF antenna as an engineering part#
Add an antenna to the System map and describe each operating band with its lower and upper frequency and stated gain. Record polarization, radiation pattern, impedance, maximum VSWR, and maximum RF power. Active antennas also carry amplifier gain and noise figure; their supply belongs in the part's power-input ratings.
The antenna specification lives with the part and its connectors, so the cable comparison can show antenna bands beside the frequencies at the other end. It is more than a free-text antenna label: the stated values participate in applicable connection checks.
Saved synthetic antenna data, reopened in the genuine product editor: 1559–1610 MHz, RHCP, 50 ohms, and a 28 dB amplifier. These illustrative values are not a customer design or a manufacturer specification.
Size coax loss against the actual cable run#
Cable records now describe type, impedance, shielding, conductor count, and gauge alongside construction and length. Choose from 18 sourced coax types to copy the manufacturer's attenuation table into the cable record. A matching coax jumper selected from the cable library brings its cable type and table with it.
DDNA calculates attenuation at the carried frequency from that table and the cable length, and shows the gain remaining after cable loss for an active antenna. The table stays with the cable rather than silently following later library updates. Engineers can explicitly set the calculated result as the cable's stated loss.
No loss is extrapolated beyond the source table's frequency range. This supports a documented antenna-to-receiver check; it does not replace a complete RF link-budget or electromagnetic simulation.
For the synthetic 2 m RG-316 run, DDNA computes 2.2 dB loss at 1575.42 MHz and 25.8 dB remaining amplifier gain against the receiver's illustrative 20–35 dB input range. The screenshot shows the actual product calculation.
Choose navigation signals and receiver outputs#
RF choices now include GPS L1 C/A, L1C, L2C, and L5; Galileo E1, E5a, and E5b; GLONASS L1 and L2; and BeiDou B1I, B1C, and B2a. Two whole-band navigation choices support receivers specified by band rather than an individual signal.
Data choices add NMEA 0183, NMEA 0183-HS, RTCM corrections, and the one-pulse-per-second timing output. PCI Express generations 1 through 6 are also selectable data profiles, with each profile stating its single-lane rate; lane count remains a connection property.
Apply the relevant RF or data profile directly to a connector as well as to a relationship. Navigation reception and the receiver's digital output can therefore be expressed separately.
Check the antenna, cable, and receiver together#
Connection findings can identify antenna-band endpoints outside the stated antenna bands, cable impedance that differs from the antenna, and active-antenna gain after cable loss outside the receiving connector's accepted input-gain range. The receiver connector can state that accepted gain range directly.
Power checks also compare a supplied active antenna's input rating with the receiver's stated feed voltage, including signal-direction antenna feeds. Nominal-only power inputs participate in the applicable rating checks.
Missing specifications remain unknown. Without enough attenuation data, DDNA does not invent cable loss or assert a full gain-range result. These are checks of the stated engineering records, not a claim that an RF system is qualified.
Collaborate in the same engineering view#
People on the same System map can see named pointers, colored selection rings, and presence avatars. Selecting an avatar moves the view to that person's selection, and shared model and layout changes are picked up as people work. Pinned notes add a discussion at a part or a fixed canvas location, with replies and resolve or reopen actions. Part-anchored notes move with their part. Keep open displays a note as a shared sticky note; reviewers with read access can participate. Project Chat can also manage notes through confirmed actions. Notes belong to the working map and are discussion records rather than model revisions.
Place a subsystem before its first release#
A project can be placed in another project's system while still in work, with the required management authority in both projects. A released subsystem can instead be pinned to a release.
Working placement does not expose its internal parts or connectors as a released interface. The parent cannot be released until that subsystem has an appropriate selected release. This changes the earlier release-first placement workflow without weakening the parent's release boundary.
Browse and link Onshape documents as yourself#
The Projects list opens a full document browser for linking. Personal Onshape Government sign-in supports browsing, importing, and linking under the person's own access, with readable identity and document activity information.
This depends on a configured company sign-in application. Background webhook processing remains a workspace connection function; personal browsing does not imply a new blanket access grant.
Turn tagged CAD conversations into tracked issues#
Tagged Onshape comments become project issues. A drafting pass can organize the comment into the project's issue template while retaining its factual content. Replies and resolve or reopen events are recorded with the issue, keeping the engineering discussion connected to the originating design conversation.
Connect conditions of use to a selected verification method#
Record environmental exposure, level, duration, and agreement status in Conditions of use. A pinned standards-method catalog helps identify candidate methods and procedures, while lifecycle coverage shows which situations have been considered.
Engineers choose and tailor the project's proposed test-method records. Verification cases can pin a method revision, and the verification cross-reference matrix carries the chosen method and tailored level. An undecided method stays undecided; DDNA does not turn a whole standard into a claim of verification.
Put each Intent register list in one place#
ConOps-owned lists live in the ConOps Register; other Intent lists live in the Intent Register. The ConOps view follows document order, shows entry counts and review status, and switches to a menu on narrow screens.
Links route to the owning page. Draft with AI acts on that page's lists, and wider, more consistent tables make the register easier to read.
Open task planning on the work that needs you#
The Timeline opens around your open work, keeps today visible, folds completed phases, and shows status and owners on the row. Your tasks and Today controls support navigation, while editors can act on status where the task's gate permits it.
The POA&M register starts with personal open work when applicable. Updated timeline styling and themed scrollbars improve readability across long plans.
Make task responsibility explicit#
A new Who does what grid records who does the work, signs off, is consulted, and is informed. Responsibility checks identify missing ownership or sign-off and concentrated approval roles. Personal work can be grouped around signing off, providing input, or staying informed.
This merged functionality requires compatible task-server support; live enablement is not yet verified. Recording a sign-off role does not itself block task completion, and an informed role does not by itself send a completion notification.
Bring broader project actions to connected tools#
The MCP plugin expands its project capabilities from the Project Chat tool manifest, covering more of the same engineering and task operations. Permissions, connection scopes, project revision checks, and operation identities constrain the actions available to a connected client.
Electronic signatures remain in the application. Raw artifact replacement and PDF submission are not included in this parity expansion. Live acceptance of the expanded plugin remains to be verified.
Review changes in the language of the engineering record#
Chat approval cards show proposed changes as labeled fields. Records and findings use readable names and wording, keeping the review focused on the engineering change rather than internal keys.
Keep engineering pages usable as the project grows#
System map and Intent reads use change stamps to avoid repeatedly loading unchanged content. Map page reads combine related information, while coverage views request the statuses they need. Shared read work and warm application instances support more responsive navigation without a claimed benchmark.
Responsive page widths and phone-sized map controls preserve room for the actual engineering work.
Read issue images where the discussion happens#
Pictures attached through Gitea can appear inline in the DDNA issue conversation, served through the workspace's authorized issue route. Images that cannot be displayed remain accessible as links; externally hosted pictures remain links.
Keep team invitations straightforward#
Team and company invitations use a single invitation email per person, keeping onboarding focused on one action.
Understand the scope of a DFMEA run#
The DFMEA page adds contextual guidance and structured scope inputs so the analysis boundary is easier to state and review. The explanation belongs beside the worksheet rather than requiring people to infer how the analysis is intended to be used.
Engineering radar#
Lunar infrastructure moves into component procurement#
NASA's November 7 awards include power generation, storage, and wireless transfer components for miniCAST, to be assembled and tested before lunar delivery. A separate integrated-power solicitation is anticipated for 2027. These are procurement and development steps, not a demonstrated lunar installation. NASA award announcement.
ESCAPADE executes its powered flybys#
NASA reported that both ESCAPADE spacecraft completed powered Earth flybys on November 7 and 9, setting them on course toward Mars. Arrival maneuvers remain planned for 2027. This is an executed physical-system milestone, with further trajectory corrections still ahead. NASA mission report.
Autonomous sustainment enters a Soldier evaluation window#
The Army's November 3 preview scheduled USARPAC ACE 27-01 demonstrations for November 4–13, including autonomous air and ground platforms and follow-on operational assessments. Its relevance this week is the evaluation window. The preview does not establish results, winners, or production readiness. The engineering question is how feedback becomes a controlled design change before the next assessment. Army event scope.
What to watch#
1. Procurement should carry an interface and evidence contract#
miniCAST's component-first procurement makes the boundary between a purchased component and an accepted integrated system unusually visible. Our inference is that interface requirements and acceptance evidence must travel with each supplier contribution: mechanical attachment, electrical behavior, operating modes, and responsibility for integration testing.
This connects to DDNA's thesis of a coherent program state. A sourcing decision should resolve to the selected part definition, interface obligations, proposed changes, and the authority that accepts the assembled configuration.
Watch for published interface definitions, component acceptance criteria, and allocation of system-level tests when the integrated-power solicitation appears. Those are stronger adoption signals than a digital-model announcement alone. NASA describes future assembly and testing; this award does not show that a shared model or any particular engineering platform is being used. November 7 program context.
2. The operating sequence deserves configuration control#
ESCAPADE illustrates a product whose outcome depends on hardware and a precisely staged operational sequence. A design baseline alone cannot explain which commanded sequence, navigation solution, and acceptance decision produced a particular flight result.
Our engineering inference is to treat approved operating sequences and their verification obligations as controlled configuration items alongside the physical system. That fits DDNA's connection between intent, configuration, human decisions, and reproducible evidence, without claiming that DDNA controls spacecraft.
Watch for traceable sequence revisions, rehearsals tied to the flown configuration, and explicit authorization for later trajectory changes. These signals would show engineering control extending into operations. Successful flybys establish the reported milestone; they do not establish Mars arrival or validate every later sequence. The primary source is NASA's November 9 flight report, not a new standard or a universal acquisition requirement. Mission sequence context.
3. Turn model uncertainty into owned engineering work#
Strategic context: NISTIR 8620, published July 21, 2026, summarizes manufacturing digital-twin workshops. It identifies interoperability and verification, validation, and uncertainty quantification as persistent challenges. It is a research-priority report, not a new mandatory standard.
The big idea is to turn uncertainty into explicit work: identify the decision a model supports, record the uncertain quantity or assumption, assign an owner, and define the observation that would reduce it enough for acceptance. A model can then be useful before every uncertainty is resolved, provided the unresolved conditions remain visible.
That aligns with DDNA's thesis of keeping requirements, model state, decisions, and evidence connected. Watch for uncertainty registers linked to acceptance criteria, measured-versus-predicted comparisons, and named closure decisions in manufacturing workflows. NIST's report establishes the need, not adoption of this proposed workflow or evidence that any vendor has solved it. NIST report context.
Closing#
The next engineering review should make three things easy to inspect: the configuration being decided, the evidence that applies to it, and the person authorized to accept it.